Project Profile
Semiconductor CHS 2140 Electrical Room
Project profile for Viking Specialty Contracting environmental work in Chandler, Arizona.
Project Overview
Controlled environmental work planned around a semiconductor/industrial electrical room.
Viking performed environmental contracting services for a industrial & manufacturing facility in Chandler, Arizona. The project is tagged for Industrial & Manufacturing; Technology & Semiconductor and supports the VCT removal; black mastic removal; complex containment around energized electrical panels; negative air; HEPA filtration; wet methods; clearance support service categories.
- Location
- Chandler, Maricopa County
- Facility
- Semiconductor/industrial electrical room
- Scope
- VCT removal; black mastic removal; complex containment around energized electrical panels; negative air; HEPA filtration; wet methods; clearance support
Project Gallery
Field conditions, protection measures, and project controls.
Approved project imagery can be added to the prepared gallery as it becomes available.
Services Documented
- VCT removal
- black mastic removal
- complex containment around energized electrical panels
- negative air
- HEPA filtration
- wet methods
- clearance support
Materials / Conditions
- VCT
- black mastic
Project Semiconductorligence
Project details corporate clients need to evaluate the work.
- Project ID
- V24-096
- Client/Public Name
- An Arizona industrial & manufacturing semiconductor/industrial electrical room
- City
- Chandler
- County
- Maricopa
- Industry
- Industrial & Manufacturing; Technology & Semiconductor
- Building Type
- Semiconductor/industrial electrical room
- Schedule
- 2025-02-05 - 2025-02-10
- Public Use
- Use only if permitted; otherwise describe as a major semiconductor facility
Project Challenge
Protect the facility while the work moved through regulated conditions.
The work required coordination, containment, safety planning, and documentation appropriate for a semiconductor/industrial electrical room environment.
Viking Response
Contain the work. Protect the facility. Support the next phase.
Services documented for this project include: VCT removal; black mastic removal; complex containment around energized electrical panels; negative air; HEPA filtration; wet methods; clearance support. Materials/work areas included: VCT, black mastic.
Frequently Asked Questions
What materials were addressed in the Semiconductor CHS 2140 electrical room?
The documented materials included VCT flooring and black mastic in a semiconductor and industrial electrical-room environment.
How is containment planned around energized electrical panels?
The work requires careful isolation of the work zone, coordination with facility and electrical teams, negative air, HEPA filtration, wet methods, and controls that protect active equipment.
Why is black mastic removal technically sensitive?
Black mastic may contain asbestos and can be difficult to remove cleanly. Testing, approved methods, dust control, and clearance support are important before follow-on work.
Can Semiconductor or semiconductor project details be published?
Client-identifying details should be published only after Viking confirms public-use approval. The project can be described by facility type, city, scope, and controls when confidentiality applies.