Project Profile

ASU Irish, Hayden, Best Halls

Project profile for Viking Specialty Contracting environmental work in Tempe, Arizona.

Bathroom containment and surface protection at ASU Irish Hall in Tempe, Arizona
Bathroom containment and surface protection at ASU Irish Hall in Tempe, Arizona.

Project Overview

Controlled environmental work planned around a university residence halls.

Viking performed environmental contracting services for Arizona State University in Tempe, Arizona. The project is tagged for Colleges & Universities and supports the Asbestos abatement; floor removal; mastic removal; negative air containment; critical barriers; occupied-building protection service categories.

Location
Tempe, Maricopa County
Facility
University residence halls
Scope
Asbestos abatement; floor removal; mastic removal; negative air containment; critical barriers; occupied-building protection

Services Documented

  • Asbestos abatement
  • floor removal
  • mastic removal
  • negative air containment
  • critical barriers
  • occupied-building protection

Materials / Conditions

  • Flooring
  • tile/mastic
  • carpet/non-ACM separation

Project Semiconductorligence

Project details corporate clients need to evaluate the work.

Project ID
V25-147
Client/Public Name
Arizona State University
City
Tempe
County
Maricopa
Industry
Colleges & Universities
Building Type
University residence halls
Schedule
2026-02-09 - 2026-06-23
Public Use
Use with permission / public institution

Project Challenge

Protect the facility while the work moved through regulated conditions.

The work required coordination, containment, safety planning, and documentation appropriate for a university residence halls environment.

Viking Response

Contain the work. Protect the facility. Support the next phase.

Services documented for this project include: Asbestos abatement; floor removal; mastic removal; negative air containment; critical barriers; occupied-building protection. Materials/work areas included: Flooring, tile/mastic, carpet/non-ACM separation.

Frequently Asked Questions

What environmental work was performed at ASU Irish, Hayden, and Best Halls?

The documented scope included asbestos abatement, floor and mastic removal, negative air containment, critical barriers, and occupied-building protection in university residence halls.

How is abatement coordinated in occupied residence halls?

Residence-hall work is coordinated through phasing, controlled access, critical barriers, negative air, HEPA cleaning, and communication with campus facilities and project teams.

What materials were addressed on this project?

The documented materials included flooring, tile and mastic, and carpet areas requiring separation from non-asbestos-containing materials.

What project records support this university work?

The project record includes a closeout report with project documentation, schedule information, and the controls used to support turnover and follow-on work.