Project Profile
ASU Irish, Hayden, Best Halls
Project profile for Viking Specialty Contracting environmental work in Tempe, Arizona.
Project Overview
Controlled environmental work planned around a university residence halls.
Viking performed environmental contracting services for Arizona State University in Tempe, Arizona. The project is tagged for Colleges & Universities and supports the Asbestos abatement; floor removal; mastic removal; negative air containment; critical barriers; occupied-building protection service categories.
- Location
- Tempe, Maricopa County
- Facility
- University residence halls
- Scope
- Asbestos abatement; floor removal; mastic removal; negative air containment; critical barriers; occupied-building protection
Project Gallery
Field conditions, protection measures, and project controls.
Field conditions and protection measures documented during the university residence-hall work.
Services Documented
- Asbestos abatement
- floor removal
- mastic removal
- negative air containment
- critical barriers
- occupied-building protection
Materials / Conditions
- Flooring
- tile/mastic
- carpet/non-ACM separation
Project Semiconductorligence
Project details corporate clients need to evaluate the work.
- Project ID
- V25-147
- Client/Public Name
- Arizona State University
- City
- Tempe
- County
- Maricopa
- Industry
- Colleges & Universities
- Building Type
- University residence halls
- Schedule
- 2026-02-09 - 2026-06-23
- Public Use
- Use with permission / public institution
Project Challenge
Protect the facility while the work moved through regulated conditions.
The work required coordination, containment, safety planning, and documentation appropriate for a university residence halls environment.
Viking Response
Contain the work. Protect the facility. Support the next phase.
Services documented for this project include: Asbestos abatement; floor removal; mastic removal; negative air containment; critical barriers; occupied-building protection. Materials/work areas included: Flooring, tile/mastic, carpet/non-ACM separation.
Frequently Asked Questions
What environmental work was performed at ASU Irish, Hayden, and Best Halls?
The documented scope included asbestos abatement, floor and mastic removal, negative air containment, critical barriers, and occupied-building protection in university residence halls.
How is abatement coordinated in occupied residence halls?
Residence-hall work is coordinated through phasing, controlled access, critical barriers, negative air, HEPA cleaning, and communication with campus facilities and project teams.
What materials were addressed on this project?
The documented materials included flooring, tile and mastic, and carpet areas requiring separation from non-asbestos-containing materials.
What project records support this university work?
The project record includes a closeout report with project documentation, schedule information, and the controls used to support turnover and follow-on work.